Structural failures can arise at any stage, from design and material selection to construction and maintenance. These cases studies cover buildings, bridges, temporary works and other structures.
Quick links
- Cave Creek platform collapse
- Temporary works failures
- Engineering disasters – how do they happen?
- Oroville Dam incident
- Safety in design
- Informing our response to the climate change crisis
- World Trade Centre collapse – WTC1, WTC2 and WTC7
- Bridges and other failures
- Legacy documents from the Canterbury earthquakes informing future events
- Mass timber construction: a disaster about to happen?
- Disciplinary decision – residential house
- Disciplinary decision – retaining wall
- Disciplinary decision – boundary cut
- Disciplinary decision – Southland Stadium
Cave Creek platform collapse
The Cave Creek disaster occurred on 28 April 1995 when a scenic viewing platform in Paparoa National Park, New Zealand collapsed, resulting in the deaths of 14 people. Gordon presents the facts of the tragedy and looks at some of the technical factors and the human factors behind the tragedy.
Cave Creek platform collapse case study | 1.2 MB
Temporary Works failures
Presented by Brendan Attewell CPEng CMEngNZ CEng MICE, is based on lessons learnt from a temporary works failure in New Zealand. He discussed how the review of internal procedures against international best practice has resulted in better controls on these high risk activities, the root cause of common temporary works failures, how the NZ construction and engineering community has come together to try to address these failures (establishment of the Temporary Works forum) with the development of NZ Good Practice, as well as how further initiatives that are led by the TWF and NZSSE are helping to drive safer workplaces.
Engineering disasters – how do they happen?
Failures can happen for many reasons. Brian Leyland DistFEngNZ, FIMechE discussed the impact of hubris on engineering failures such as the Whaeo Dam, the Boeing 737 Max and the Columbia Space shuttle disasters.
Engineering disasters case study | 1005.5 KB
Oroville Dam incident
Failures can happen for many reasons. David Menendez and Brian Benson discussed lessons to be learnt from the Oroville Dam incident.
Oroville Dam incident case study | 2.3 MB
Safety in design
Chris Watson will explored safety in design. He discussed "The Pathology of a Common Workplace Hazard" and refered to the example: Slippery-When-Wet Entrance. He touched on multiple areas such as 'Plan, Do, Check, Act', how architects listen, the lesson that can be learned, hazard elimination tools and gave hazard examples.
Informing our response to the climate change crisis
Members of the Sustainability Society committee discussed some key lessons learnt across a number of sectors and the shifts that need to be made to address the climate crisis.
World Trade Center collapse – WTC1, WTC2 and WTC7
Presented by Charles Clifton on the causes of the collapse of WTC1, WTC2 and WTC7 in the World Trade Center complex on 11 September 2001 and the collapse sequences involved.
Bridges and other failures
This presentation covered many New Zealand and overseas failures and discussed the causes and solutions to prevent reoccurrence. Presented by Alex Gray, a past-president of New Zealand Concrete Society (now the Concrete NZ Learned Society) who has worked as a Civil Engineer and Project Manager for over 40 years. He has been involved in the construction of major infrastructure projects including the Terrace Tunnel and Ngauranga Incrementally launched bridges.
Bridges and other failures case study | 1.8 MB
Legacy documents from the Canterbury earthquakes informing future events
In 2023, Engineering New Zealand developed legacy documentation to capture lessons learnt from the work of the Engineering New Zealand Expert Panel in helping to resolve insurance claims related to the Canterbury Earthquake Sequence. This webinar introduced these documents and provided an opportunity to discuss how the lessons can be applied to addressing residential damage resulting from current and future natural disaster events.
Legacy documentation | 243.6 KB
Canterbury earthquake case study | 894.2 KB
Mass timber construction – a disaster about to happen?
This presentation highlights the potential consequences of overlooking the fundamentals of timber design. It explores how a lack of understanding among any stakeholder – from designer to builder to owner – regarding timber's inherent properties, good design principles and clear communication can lead to serious issues. Through three real-world examples, we'll see how moisture damage, inadequate load paths, and flawed design execution can result in costly repairs or, in the worst-case scenario, complete structural collapse. It also explores best practices and key considerations to ensure safe and successful timber structures.
Engineering failures in modern timber design | 1.9 MB
Disciplinary decision – residential house
The complainant engaged company A to prepare a structural design for their house. The engineer completed their design and signed off the PS1 for the structural design.
The Disciplinary Committee found the respondent engineer did not meet the competency standards expected of a reasonable engineer in providing engineering services for the initial and amended designs for the complainant’s house.
Residential house Disciplinary Committee decision case study | 2.1 MB
Disciplinary decision – retaining wall
The complainant in this case was a City Council employee. The complaint related to the competence and ethical conduct of the respondent engineer, as illustrated by three representative instances of their work. This case will focus on one of the three instances identified by the complainant relating to deficiencies in the respondent’s approach to geotechnical analysis and documentation and an unwillingness to accept advice and recommendations from the City Council and independent peer reviewers.
Retaining wall Disciplinary Committee decision case study | 2.6 MB
Disciplinary decision – boundary cut
The complainants raised concerns with Engineering New Zealand about an engineer’s work with a property developer subdividing land that shared a boundary with their property.
Boundary cut Disciplinary Committee decision case study | 5.1 MB
Disciplinary decision – Southland Stadium
The Disciplinary Committee found the respondent engineer did not recognise the special nature and risks inherent in a project of this size and type and acted outside his level of competence. He did not meet the standards expected of a reasonable engineer in providing engineering services for the stadium’s design or construction monitoring.
Southland Stadium Disciplinary Committee decision case study | 5.8 MB