Disciplinary decision – residential house

The complainant engaged company A to prepare a structural design for their house. The engineer completed their design and signed off the PS1 for the structural design.

The Disciplinary Committee found the respondent engineer did not meet the competency standards expected of a reasonable engineer in providing engineering services for the initial and amended designs for the complainant’s house.

Residential house Disciplinary Committee decision case study   |  2.1 MB


Disciplinary decision – retaining wall

The complainant in this case was a City Council employee. The complaint related to the competence and ethical conduct of the respondent engineer, as illustrated by three representative instances of their work. This case will focus on one of the three instances identified by the complainant relating to deficiencies in the respondent’s approach to geotechnical analysis and documentation and an unwillingness to accept advice and recommendations from the City Council and independent peer reviewers.

Retaining wall Disciplinary Committee decision case study   |  2.6 MB


Disciplinary decision – boundary cut

The complainants raised concerns with Engineering New Zealand about an engineer’s work with a property developer subdividing land that shared a boundary with their property.

Boundary cut Disciplinary Committee decision case study   |  5.1 MB

Boundary cut Disciplinary Committee decision case study   |  5.1 MB


Disciplinary decision – Southland Stadium

The Disciplinary Committee found the respondent engineer did not recognise the special nature and risks inherent in a project of this size and type and acted outside his level of competence. He did not meet the standards expected of a reasonable engineer in providing engineering services for the stadium’s design or construction monitoring.

Southland Stadium Disciplinary Committee decision case study   |  5.8 MB


Disciplinary Decision – fire report

The Fire Report concerned the conversion of part of an existing building from offices to a dental clinic. The area was a small part of a larger complex. The report was headed ‘Fire Assessment in Accordance with C/AS1 (2005)’ and stated that it treated the area of the conversion “in isolation”. It comprised a two page report and a DENTEC Fitout Solutions floorplan with travel distances to exits added by the respondent. The complainant stated that “the NZFS has significant concerns with regard to this design and its potential impact on the safety to all occupants of the building”. He highlighted their concerns that the compliance document C/AS1 had not been applied correctly and that there was insufficient information in the report to determine whether the design was adequate. The complainant also noted that “The fire report has neither assessed the occupancy of the rest of the building nor provided any justification for their exclusion (eg by fire separating this tenancy from the rest of the building).”

Fire report Disciplinary Committee decision case study   |  1.7 MB