Date: |
10 Dec 2026, 5.30PM – 7.00PM |
duration: |
1 hr 30 mins |
Venue: |
Dominion Constructors |
Address: |
170 Marua Road Auckland |
Cost: |
Free event |
With three fascinating project case studies covering formwork, falsework, crane foundations and scaffold design, this is a great opportunity to gain insights into innovative temporary works solutions and hear directly from the teams involved.
Acrow New Zealand – The Interaction Between Falsework and Formwork
Exploring the relationship between falsework and formwork from both design and installation perspectives. Using the Central Interceptor and City Rail Link (CRL) projects as case studies, Acrow New Zealand will discuss the considerations and challenges involved in bringing these systems together on complex construction projects.
DHC Engineers – Liebherr 180 HC Tower Crane Installation at One Saint Stephens
Discover the innovative engineering behind the installation of a free-standing Liebherr 180 HC tower crane ahead of the excavation of a two-level basement.
DHC will be presenting on the Liebherr 180 HC free-standing tower crane installation at One Saint Stephens which went up before the two-level basement was dug. The crane base consisted of four 900 mm reinforced concrete piles. As the site was excavated around them, from ground level (RL 66.25) down to RL 59.48., 12 mm steel plate walls were welded between the casings, with 150UC frames at each excavation stage. Together they turn the four piles into a braced composite box that keeps the crane base stiff as more of the piles is exposed. Because the crane was working from the start of the dig, this saved months on the programme.
Structures For Good – Summerset Half Moon Bay
An insight into the design of a 25-metre clear-span scaffold at Summerset Half Moon Bay, showcasing the engineering considerations behind this impressive temporary works solution.
Formwork Systems on Display
Alongside the presentations, attendees will have the opportunity to view Dokadek and PERI formwork systems, which will be set up for viewing in Dominion’s plant yard.
Whether you're involved in temporary works design, engineering, construction or installation, this is a great opportunity to connect with industry colleagues, share knowledge and explore practical engineering solutions.
We look forward to seeing you there for our final Temporary Works Forum meeting of 2026!
Join the Temporary Works forum for our final 2026 Public Meeting. Featuring an evening of presentations from Acrow, DHC Engineers and Structures For Good.
With three fascinating project case studies covering formwork, falsework, crane foundations and scaffold design, this is a great opportunity to gain insights into innovative temporary works solutions and hear directly from the teams involved.
Acrow New Zealand – The Interaction Between Falsework and Formwork
Exploring the relationship between falsework and formwork from both design and installation perspectives. Using the Central Interceptor and City Rail Link (CRL) projects as case studies, Acrow New Zealand will discuss the considerations and challenges involved in bringing these systems together on complex construction projects.
DHC Engineers – Liebherr 180 HC Tower Crane Installation at One Saint Stephens
Discover the innovative engineering behind the installation of a free-standing Liebherr 180 HC tower crane ahead of the excavation of a two-level basement.
DHC will be presenting on the Liebherr 180 HC free-standing tower crane installation at One Saint Stephens which went up before the two-level basement was dug. The crane base consisted of four 900 mm reinforced concrete piles. As the site was excavated around them, from ground level (RL 66.25) down to RL 59.48., 12 mm steel plate walls were welded between the casings, with 150UC frames at each excavation stage. Together they turn the four piles into a braced composite box that keeps the crane base stiff as more of the piles is exposed. Because the crane was working from the start of the dig, this saved months on the programme.
Structures For Good – Summerset Half Moon Bay
An insight into the design of a 25-metre clear-span scaffold at Summerset Half Moon Bay, showcasing the engineering considerations behind this impressive temporary works solution.
Formwork Systems on Display
Alongside the presentations, attendees will have the opportunity to view Dokadek and PERI formwork systems, which will be set up for viewing in Dominion’s plant yard.
Whether you're involved in temporary works design, engineering, construction or installation, this is a great opportunity to connect with industry colleagues, share knowledge and explore practical engineering solutions.
We look forward to seeing you there for our final Temporary Works Forum meeting of 2026!