Date: |
22 Oct 2026, 5.30PM – 7.00PM |
duration: |
1 hr 30 mins |
Venue: |
Okara Marina Presentation |
Address: |
151 Port Road Northland |
Cost: |
Free event |
Come along and hear about the marina construction, which included challenging soft ground conditions, significant dredging, manufacturing mudcrete on site, protection of the existing WDC waste water and stormwater assets and thrusting the rising main from the new waste water pump station.
Presented by Rob Brown of Shorewise Engineering Consultants.
Optional dinner at Dickens Inn at your own cost after the presentation
Come along and hear about the construction of the first stages of the Okara Marina with the new reclamation near complete and the first marina pier installed.
Come along and hear about the marina construction, which included challenging soft ground conditions, significant dredging, manufacturing mudcrete on site, protection of the existing WDC waste water and stormwater assets and thrusting the rising main from the new waste water pump station.
Presented by Rob Brown of Shorewise Engineering Consultants.
Optional dinner at Dickens Inn at your own cost after the presentation
Presenters
Northland Branch