Join the Taranaki Branch for a tour of the new thermal drying facility at the New Plymouth Wastewater Treatment Plant, which opened in March after being under construction for the past two and a half years. It replaces the previous dryer, which had become difficult to safely repair and maintain due to its age and the building’s limitations.
Brett Wilkinson from Beca will lead the tour and share his experiences as project manager during the design and construction of the new facility.
PPE Required: High-vis jacket, steel toe capped boots, long sleeve shirt and long trousers.
We kindly encourage carpooling due to limited parking on site. Spots are limited so sign up early!
Tour the new thermal drying facility at the New Plymouth Wastewater Treatment Plant with the Taranaki Branch to explore this recently opened, multi-year project.
Join the Taranaki Branch for a tour of the new thermal drying facility at the New Plymouth Wastewater Treatment Plant, which opened in March after being under construction for the past two and a half years. It replaces the previous dryer, which had become difficult to safely repair and maintain due to its age and the building’s limitations.
Brett Wilkinson from Beca will lead the tour and share his experiences as project manager during the design and construction of the new facility.
PPE Required: High-vis jacket, steel toe capped boots, long sleeve shirt and long trousers.
We kindly encourage carpooling due to limited parking on site. Spots are limited so sign up early!