Date:
12 Aug 2026,
5.30PM – 7.30PM
duration:
2 hrs
Venue:
Holmes
Address:
Level 2
254 Montreal Street
Christchurch
Cost:
Free event
Register Add to Calendar 2026-08-12 17:30:00 2026-08-12 19:30:00 Pacific/Auckland TWf Public Meeting 22 - Christchurch

The Canterbury Museum redevelopment presents a rare temporary works challenge in the heart of Christchurch: protecting and working around significant heritage fabric while enabling a major new museum to be built within a constrained city-centre site.

This presentation will uncover the significant temporary works going on behind the scenes to deliver this iconic project, including support, restraint, access, sequencing and constructability considerations required to safely progress demolition, excavation, structural alterations and new construction around retained heritage buildings.

Nick Wharmby of March Construction, Mark Patterson of Viden Group Consulting Engineers, and Shane Aitcheson will share practical insights from the design and construction interface, highlighting the coordination, risk management and problem-solving needed when temporary works become central to delivering a complex heritage redevelopment.

Holmes Engineering New Zealand hello@engineeringnz.org

The Temporary Works Forum New Zealand (TWf) is pleased to announce its 22nd public meeting and seminar. The event will be a chance to catch up with peers, network and listen to a fascinating presentation on what is happening behind the fence at the Canterbury Museum.

The Canterbury Museum redevelopment presents a rare temporary works challenge in the heart of Christchurch: protecting and working around significant heritage fabric while enabling a major new museum to be built within a constrained city-centre site.

This presentation will uncover the significant temporary works going on behind the scenes to deliver this iconic project, including support, restraint, access, sequencing and constructability considerations required to safely progress demolition, excavation, structural alterations and new construction around retained heritage buildings.

Nick Wharmby of March Construction, Mark Patterson of Viden Group Consulting Engineers, and Shane Aitcheson will share practical insights from the design and construction interface, highlighting the coordination, risk management and problem-solving needed when temporary works become central to delivering a complex heritage redevelopment.