Join the Engineering New Zealand Northland Branch for a showcase of the response to a large and complex landslide event by WSP engineers. 

You will hear about:

  • Site assessment - LIDAR, historic aerial imagery and geological mapping
  • Observational design approach - real time monitoring, Trigger Action Response Plans (TARP), and adaptive design principles
  • Earthworks design - slope stabilisation

Nibbles and networking with sponsored drinks from 5.30PM. Presentation and questions 6PM – 7PM. Dinner will follow afterwards at attendees' own expense.

Dickens Inn Engineering New Zealand hello@engineeringnz.org

On 21 January 2026, a major landslide rendered Russell Road impassable, threatening critical access for East coast communities. The Whangarei District Council, in collaboration with WSP New Zealand, undertook a rapid response to restore resilience and safety to this vital corridor.

Join the Engineering New Zealand Northland Branch for a showcase of the response to a large and complex landslide event by WSP engineers. 

You will hear about:

  • Site assessment - LIDAR, historic aerial imagery and geological mapping
  • Observational design approach - real time monitoring, Trigger Action Response Plans (TARP), and adaptive design principles
  • Earthworks design - slope stabilisation

Nibbles and networking with sponsored drinks from 5.30PM. Presentation and questions 6PM – 7PM. Dinner will follow afterwards at attendees' own expense.