Date: |
12 Mar 2026, 4.30PM – 6.30PM |
duration: |
2 hrs |
Venue: |
Fitzherbert Avenue to Fox Road Link Road Meeting Point |
Address: |
122 Mosston Road Whanganui |
Cost: |
Free event |
Join the Whanganui Branch for an exclusive look at the Fitzherbert Ave to Fox Road link road project. Led by Downer Site Engineer Jack Pillet, this session offers a firsthand construction overview and site walkover, providing a deep dive into the roadway's development followed by an open Q&A session.
PPE Requirements: Steel toe capped boots and hard hat.
The numbers for this site visit are limited to 15 due to site constraints and available parking room. Please carpool to the construction site office where possible.
THE PROJECT
"A new 600-metre link road between Fitzherbert Avenue and Fox Road, named Pingao Drive, is being built to unlock land for housing, improve local transport connectivity and support environmental resilience as part of the wider Springvale Structure Plan. The project enables future urban growth while aligning with sustainable design principles.
The link road forms part of a wider integrated catchment management programme. This programme aligns with the values of Te Awa Tupua Act 2017, reflecting a commitment to sustainable development and environmental stewardship.” (Whanganui City Council, 2026)
Join the Whanganui Branch for a site visit to the Fitzherbert Ave to Fox Road link road, followed by pizza and refreshments with your peers!
Join the Whanganui Branch for an exclusive look at the Fitzherbert Ave to Fox Road link road project. Led by Downer Site Engineer Jack Pillet, this session offers a firsthand construction overview and site walkover, providing a deep dive into the roadway's development followed by an open Q&A session.
PPE Requirements: Steel toe capped boots and hard hat.
The numbers for this site visit are limited to 15 due to site constraints and available parking room. Please carpool to the construction site office where possible.
THE PROJECT
"A new 600-metre link road between Fitzherbert Avenue and Fox Road, named Pingao Drive, is being built to unlock land for housing, improve local transport connectivity and support environmental resilience as part of the wider Springvale Structure Plan. The project enables future urban growth while aligning with sustainable design principles.
The link road forms part of a wider integrated catchment management programme. This programme aligns with the values of Te Awa Tupua Act 2017, reflecting a commitment to sustainable development and environmental stewardship.” (Whanganui City Council, 2026)
Presenters
Whanganui Branch